Walls – Second Cut

First wall glued  up ok so we repeated the process with the second wall, i.e spread glue, clamp and then rest old lathe bed on top of the middle of the joint to apply some pressure there.

This weekend’s work consisted of two processes, bolting the wood floor to the trailer frame and starting to route the recesses in the bottom of the walls.

Bolting the frame down went really well, only thing that went wrong was the snapping of a 3mm drill bit so all in all I’m pretty pleased.

Image00013.jpg

The floor can’t be fully bolted down yet as we still need to get it galvanised, I’m thinking that I may drill the holes out a little larger in order to maintain sufficient clearance once dipped.

Image00014.jpg

A total of 10 M12 bolts will be used to hold the floor (and therefore the rest of the teardrop to the frame) so I don’t think there is much risk of something going wrong.

Image00016.jpg

I didn’t get many photos of the second process, I will take some of the finished walls at some point but it basically consisted of sitting the wall in place, drawing up the back of the base where it meets the wall and then across the top.

Image00017.jpg

This was then routed out at a depth of 11mm for a distance of 80mm from the edge, then stepped up to 9mm for the remaining 36mm until reaching the line. The reason for this recesses to so that when the underlining is painted on to the underside of the floor and the walls there will still be room for the trailer frame to fit. Four small recesses were then cut to house the heads of the bolts.

 

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s